Black & Decker DCM200C Guía de instalación Pagina 19

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 34
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 18
DCM 200 Installation
Page 19
2.3.4. Sensors
pH and ORP Sensor Wiring
DCM 200 controllers normally have the cables for the pH and ORP sensors pre-wired and marked on the cables for the
appropriate sensor. The SGT (Solution Ground+Temp) sensor and flow switch are also pre-wired at the factory. If
replacing these cables, connect the center pins on the coaxial cables to the positive [+] terminal and the metallic shield is
connected to negative [-]. A solution ground reference is required for proper operation. An SGT sensor has a solution
reference (Green or Black) and temperature sensor (White or Red). Even if the temperature sensor is not being used, the
solution reference must be connected to the ground terminal.
Vista de pagina 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 33 34

Comentarios a estos manuales

Sin comentarios